TRANSFORMING OFFICE BUILDING MAINTENANCE PREVENTIVELY USING KURT LEWIN’S MODEL AT PT SURVEYOR INDONESIA MAKASSAR

Main Article Content

Andi Fiqra Tama Mattotorang
Arif Alauddin Umar

Abstract

Effective office building maintenance is key to supporting organizational productivity and operational sustainability. However, many institutions, including State-Owned Enterprises (SOEs) like PT. Surveyor Indonesia, Makassar Branch, still implement a reactive corrective maintenance system, leading to unexpected costs and work disruptions. This study aims to analyze the transformation process of the maintenance system from corrective to preventive using Kurt Lewin's change model approach. The research method employed is descriptive qualitative with a case study approach. Data were collected through in-depth interviews with staff from the Procurement and Asset Optimization unit, direct observation, and document studies. The results indicate that the change process was successfully implemented through the three stages of Lewin's model: (1) Unfreeze, which involved building awareness of the old system's weaknesses and the urgency for change; (2) Change, which involved implementing a structured preventive maintenance monitoring system using a spreadsheet, covering planning, scheduling, and documentation; (3) Refreeze, which institutionalized the new system through supervision, mandatory reporting, and periodic evaluations to establish it as a work culture. In conclusion, Kurt Lewin's model proved to be an effective framework for managing the maintenance system change, resulting in more efficient asset management, better-controlled costs, and a safer, more comfortable work environment.

Downloads

Download data is not yet available.

Article Details

How to Cite
Mattotorang, A. F. T., & Umar, A. A. (2025). TRANSFORMING OFFICE BUILDING MAINTENANCE PREVENTIVELY USING KURT LEWIN’S MODEL AT PT SURVEYOR INDONESIA MAKASSAR. Jurnal Administrasi Terapan, 3(2), 279–294. Retrieved from https://journal.stialanmakassar.ac.id/index.php/admit/article/view/3833
Section
Articles

References

Amina, A., Kassem, A., & Sleem, W. (2022). Applying Lewin’s Change Management Theory To Improve Patient’s Discharge Plan. Mansoura Nursing Journal, 9(2), 335–348. https://doi.org/10.21608/mnj.2022.295591

Bezjian, J., Godinez, J., Dean, B. P., & Wright, S. L. (2023). Teaching Lewin’s Model on Change Management: Lessons from the “Cool Runnings” Film. Journal of Instructional Pedagogies, 29, 1–18.

Anggara, S., & Sumantri, I. (2016). Administrasi Pembangunan: Teori dan Praktek. CV Pustaka Setia.

Institute, P. M. (2017). The standard for portfolio management.

Harrison, R., Fischer, S., Walpola, R. L., Chauhan, A., Babalola, T., Mears, S., & Le-Dao, H. (2021). Where do models for change management, improvement and implementation meet? A systematic review of the applications of change management models in healthcare. Journal of Healthcare Leadership, 13, 85–108. https://doi.org/10.2147/JHL.S289176

Hussain, S. T., Lei, S., Akram, T., Haider, M. J., Hussain, S. H., & Ali, M. (2018). Kurt Lewin’s change model: A critical review of the role of leadership and employee involvement in organizational change. Journal of Innovation and Knowledge, 3(3), 123–127. https://doi.org/10.1016/j.jik.2016.07.002

Maulana, A., Danar Dana, R., & Dienwati Nuris, N. (2024). Implementasi Algoritma K-Means Clustering Dalam Pengelompokan Data Kerusakan Rumah Akibat Bencana Alam Di Kabupaten Cirebon. JATI (Jurnal Mahasiswa Teknik Informatika), 8(2), 1417–1424. https://doi.org/10.36040/jati.v8i2.9024

Mellita, D., & Elpanso, E. (2020). Model Lewin Dalam Manajemen Perubahan: Teori Klasik Menghadapi Disrupsi Dalam Lingkungan Bisnis (Vol. 19, Issue 2).

Toves, P. R., Graf, L., & Gould, D. A. (2016). Innovative Use of Force Field Analysis: Factors Influencing Technology-Enabled Change. Journal of Behavioral and Applied Management, 17(2), 85–102. https://doi.org/10.21818/001c.1183

Wahyuni, S., & Khoirudin, R. (2020). PENGANTAR MANAJEMEN ASET.